enduroframe

True Steel Frames, Victor Harbour Medical Center

A Case Study in Innovative Construction Solutions

Victor Harbour Medical Centre by True Steel Frames wins high commendation in the ASI steel awards

The project was to provide light gauge steel frames for the upper story of the Victor Harbour Medical Centre. Covering almost 2300 square meters, this represents the largest single building constructed by True Steel Frames. Meticulous detailing resulted in an exceptionally efficient final structure, achieved through the minimization of structural steel, maximising cold formed steel, and thinking ahead the logistical challenges.

True Steel Frames, Victor Harbour Medical Center

Challenges of scale

The Victor Harbour Medical Centre presented some interesting considerations that had to be resolved in order for Adelaide-based True Steel Frames to initially win the project and then to deliver on these promises.

This large building covered almost 2300m2 and was the largest single building True Steel Frames had supplied in their history.

True Steel Frames, Victor Harbour Medical Center

Cost reduction

Initially, the building was designed with an all-structural steel framework, complemented by lightweight non-structural LGS for walling.

True Steel Frame’s approach to value engineering focused on minimizing the use of structural steel throughout the build. This was achieved by strategically eliminating various structural steel elements through thoughtful planning and maximizing the use of cold-formed sections whenever feasible.

The design brief specified that window head heights should align with ceilings to achieve a seamless appearance. By thinking innovatively, they crafted the windows in a way that allowed the ceilings to merge into the openings, serving as the reveal. This innovative approach provided a finish which greatly pleased the architect.

Engineering with LGS

One of the significant challenges involved was providing support for the mechanical equipment on the roof without using structural steel. Collaborating with an engineer, True Steel Frames devised a light gauge steel solution using the ENDUROFRAME® building system to uphold the substantial plant platform and eliminate the need for structural steel entirely which was a significant achievement. Roof trusses were up to 17m long with voids incorporated into the truss for ducts, beams, and gutters.

Additionally all the tricky cantilever canopies were able to work without the need for anything other than light gauge steel trusses designed using the ENDUROCADD® software.

True Steel Frames, Victor Harbour Medical Center

Efficient construction

The construction project involved meticulous planning to address various challenges. This included careful consideration of building size, on-site logistics, and design aspects such as truss and wall dimensions to comply with transport regulations. Efficient scheduling of manufacturing and panel stacking was crucial to minimize double handling on-site and optimize load capacity. Due to the school’s location on a busy road, traffic control measures were implemented for each delivery. Deliveries were strategically divided into 6 stages to ensure a steady supply without overcrowding the work site. Coordination with a large commercial crane was also essential to facilitate the installation of frames and trusses on the upper floor.

Frame erection was completed in 28 days, a remarkably swift timeline considering the scale of the project. This expedited progress was facilitated by the minimal need for structural steel and consequently reduced dependency on cranes.

Meticulous staging of the frame erection proved effective as the installer could effortlessly stand walls and trusses in one section before seamlessly transitioning to the next stage without any obstacles. This approach differs from the industry norm, where typically all wall frames are first installed before proceeding to truss installation, potentially impeding access for the installer. One significant advantage of using LGS frames in this project was their lightweight nature, which facilitated the easy handling required during the construction.

 Builder satisfaction

Upon completion, the builder, Bella Build and Design, expressed great satisfaction with the frames, highlighting that the construction process was significantly faster than if they had completed with timber frames. Additionally, they emphasized the cleanliness of the site. Very importantly, the builder was thrilled by the substantial cost savings achieved on the project, largely due to the reduction of structural steel.

True Steel Frame’s coordinatation with the builder ensured all parties were on the same page and no surprises arose that could have caused delays.

This project is a great example of how a large building with careful thinking, collaboration with a LGS centric engineer and a strong desire to not compromise on quality over price can still result in an extremely cost effective and timely build.

Would the builder use True Steel Frames again? Absolutely!

True Steel Frames

True Steel Frames, Victor Harbour Medical Center

Want to learn more?

Discover how ENDUROFRAME® can transform your next project by contacting us today

Contact Enduroframe

Border Steel Framing, Stoneway Constructions

Built Like Home

Border Truss & Frame and Stoneway Constructions deliver quality without compromise

At Stoneway Constructions, no house is too big or too small. Every project receives the same exceptional level of attention to detail because Wayne builds each home as if he were going to live in it himself.

Whether you’re dreaming of a sleek, modern skillion roof home or a timeless pitched roof design, Stoneway is ready to bring your vision to life. With over 10 years of experience building custom homes across Northern Victoria, Stoneway understands that their clients demand more than just a house. They want a home built to the highest standards.

That’s why they partner with Border Truss & Frame, a name synonymous with strength and efficiency. Their use of the ENDUROFRAME® building system ensures that every steel frame is strong, lightweight, and cost-effective. With patented, builder-friendly features, these frames are designed for faster, easier on-site assembly—helping Stoneway deliver dream homes with precision and care.

If quality craftsmanship and a personal touch are what you’re after, contact Stoneway Constructions today to discuss your next home.

Stoneway Constructions, Tocumwal NSW on Facebook

Border Truss & Frame

Stoneway Constructions Border Steel Framing

Want to learn more?

Discover how ENDUROFRAME® can transform your next project by contacting us today

Contact Enduroframe

Ultimate Steel Framing: Kool Beanz Child Care

Building a Legacy

Gold Coast Suns and Ultimate Steel Framing Team Up for Kool Beanz Child Care

The Gold Coast Suns have aimed to be more than just an AFL team right from the start. Their mission extends beyond the football field into the heart of the community by investing in the next generation of Gold Coast children.

One of their most impactful initiatives to date is the Kool Beanz child care facility, a project that demanded precision, reliability, and excellence at every stage. Given the scale and prestige of this development, partnering with a trusted and experienced frame manufacturer was non-negotiable.

Enter Ultimate Steel Framing!

Precision Engineering Meets Community Vision

Ultimate Steel Framing took the lead in manufacturing all light gauge and structural steel for the project, while also overseeing the erection process. Leveraging the power of ENDUROCADD® software, their team expertly detailed the structure, significantly reducing the need for hot-rolled sections and keeping costs in check.

Over a focused three-month construction period, 26 tonnes of TRUECORE® steel were installed seamlessly. Thanks to meticulous planning and expert detailing, the framing posed no issues for follow-on trades such as electrical, plumbing, and HVAC installations.

A Model of Efficiency and Collaboration

This project stands as a testament to what can be achieved when community vision meets engineering excellence. The Kool Beanz facility is more than just a building. It’s a foundation for future generations to grow, learn, and thrive.

Learn more about the Kool Beanz childcare facility here.

Ultimate Steel Framing website

Ultimate Steel Framing Kool Beanz Nerang
Ultimate Steel Framing Kool Beanz Nerang
Ultimate Steel Framing Kool Beanz Nerang

Want to learn more?

Discover how ENDUROFRAME® can transform your next project by contacting us today

Contact Enduroframe

Opening header solutions

ENDUROFRAME® opening header solutions for any sized door or window

The ENDUROFRAME® system offers a variety of options designed to support loads above door and window openings, covering a broad spectrum of truss loads and opening widths. This extensive range of options ensures that there is design flexibility, structural integrity, and cost effectiveness.

Trussed header

The most cost-effective and straightforward opening system is a trussed header, which can accommodate openings of up to 2700mm. These headers can be constructed using standard sections produced by the ENDURO® rollformer.

Example of openings with webbed header

Angle lintel

High tensile steel angle lintels are available in two sizes: 200 x 35 x 1.0mm and 200 x 35 x 1.5mm.

Opening widths given in the Tables are nominal and cover 1000-4900mm. These are rollformed from high tensile G450 steel and can be purchased cut to exact length, or in longer stock lengths to be cut to size in the factory.

Examples of Angle Lintel header ENDUROFRAME® building system

C purlin

C purlin can be the strongest header option as the available sizes can range from 100mm to 300mm. Purlins are easily available in most locations and can be purchased cut to exact length, or in longer stock lengths to be cut to size in the factory as required.

Beam headers can be made from ENDUROFRAME® sections cut to length off the rollformer. Beam headers can be selected by detailers when inserting a door or window opening, and also using the auto-opening feature, which makes beam selection simple. The advantage of this method is no stock needs to be ordered or kept as the parts are rollformed only when required. They are most suited for smaller openings.

Examples of C Purlin header ENDUROFRAME® building system

PFC

For wide openings, or in highly loaded situations, hot rolled sections such as parallel flange channels (PFC) can also be used. Great information around the spanning of these sections can be found at Spanman.

Want to learn more?

Discover how ENDUROFRAME® can transform your next project by contacting us today

Contact Enduroframe

Steel Framing Demand Surges at SydneyBuild 2025

Steel Framing Demand Surges at SydneyBuild 2025

Attending the recent SydneyBuild 2025 exhibition confirmed what we’ve been seeing across the industry – the appetite for steel framing is growing rapidly. It was fantastic to have builders and homeowners approach us with a simple but powerful question: “Where can we buy steel framing?”

This growing interest reflects a broader awareness of the many benefits steel brings to modern homes. While non-combustibility and pest resistance were once the primary drivers, today’s builders and homeowners are recognising a much wider range of advantages:

  • Sustainability
  • Perfect straightness
  • No shrinking or warping
  • Lightweight and easy to handle

These features are not just theoretical – they’re making a real difference on-site, especially for installers who appreciate the ease, lightness, and precision of working with steel.

Why ENDUROFRAME®?

The ENDUROFRAME® building system encapsulates all these benefits and more. Our advanced steel framing solution is not only high-performing but also cost-effective, thanks to our focus on efficiency at every stage:

  • Optimized detailing and machine run time
  • Fast, easy assembly
  • Intelligent on-site erection
  • Comprehensive layouts, 3D imagery, and full connection details

We’ve engineered the ENDUROFRAME® building system to streamline the entire process from design to installation, making it a smart choice for builders looking to stay ahead.

Enduroframe team and visitors at SydneyBuild exhibition 2025

Want to learn more?

Discover how ENDUROFRAME® can transform your next project by contacting us today

Contact Enduroframe

Automated ICJs Intermediate Ceiling Joists and Binders

Automated ICJs and Binders

A Smarter Way to Design Light Gauge Steel Roof Structures

At Enduroframe, we’re always looking for ways to make roof design more efficient, precise, and user-friendly. That’s why we’re excited to highlight a powerful enhancement in our software: Automated Intermediate Ceiling Joists (ICJs) and Binders. This feature streamlines ICJ insertion, making it easier than ever to reinforce ceilings while reducing manual effort.

What Are ICJs and Binders?

ICJs are structural members that run parallel between trusses, at the same height as truss bottom chords. They provide key support for plasterboard ceilings and eliminate the need for ceiling battens or running trusses at closer spacings. In cases where trusses are spaced at 1200mm, ICJs help can provide a working platform when working at height.

Binders, on the other hand, run perpendicular to trusses and ICJs, sitting above roof truss bottom chords. They support the ICJs, ensuring a stable and well-distributed load. Binders can also be used as lateral restraints for truss bottom chords.

ENDUROCADD® Automation

Previously, adding ICJs and binders was a very manual process, requiring detailers to add members one-by-one as beams. Now our automated ICJ and binder insertion takes the guesswork out of the process. The ENDUROCADD® software follows built-in design rules to automatically place ICJs and binders where needed, ensuring optimal structural integrity. Users can also fine-tune settings for complete customization.

Key Features & Benefits

Automatic ICJ Placement – ICJs are intelligently inserted at the midpoint between roof trusses, ensuring proper support and reducing manual input.

Flexible User Configurations – Choose the section type, truss spacing, maximum ICJ length before splicing, and whether to add ICJs across the entire roof or block by block.

Smart Binder Integration – Binders are placed at user-defined spacing, supporting ICJs seamlessly. Users can define overlap lengths and choose whether binders are boxed.

Precision Manufacturing Data – ICJs and binders are now included in the BOM (Bill of Materials) and NC data for seamless manufacturing and job tracking in ENDUROCADD NX and ENDUROHUB.

Why It Matters

Eliminating repetitive tasks makes life easier for detailers. Automating ICJs and Binder insertion in ENDUROCADD® software is just one example of our ongoing commitment to innovation and continuous improvement of the ENDUROFRAME® building system.

For installers, it can mean less trusses and/or ceiling battens to install while providing a safe work platform, making a cost-effective roof solution!

Find out how to start making frames

With automated ICJs and binders, we’re making Light Gauge Steel roof detailing more efficient, accurate, and customizable than ever.

Contact Enduroframe

Speak to an expert about how to get started making the ENDUROFRAME® system. Insert your details below and we will call you back.